Feedback

Guide: Completing Engineer's Certificate (Form 2A) for MahaRERA Projects

Are you in the process of completing a MahaRERA registered project? Form 2A, the Engineer's Certificate for Quality Assurance, plays a crucial role in ensuring the quality of materials and workmanship in construction projects. Here's a detailed guide to help you fill out and submit Form 2A accurately and effectively.

1. Accessing the Form:

  • Start by accessing Form 2A directly from the official MahaRERA website here.
  • Make sure you have the latest version of the form to ensure compliance with current regulations.

2. Understanding the Form:

  • Form 2A is essential for certifying the quality of materials used and the standard of construction workmanship in MahaRERA registered projects.
  • It requires details regarding the project, including the name, address of the promoter, and MahaRERA registration number.

3. Filling Out the Form:

  • Begin by entering the date of issuance and addressing the certificate to the promoter.
  • Provide project-specific details, such as the project name, MahaRERA registration number, and the name of the promoter.

4. Quality Assurance Certification:

  • Certify that all construction materials, fixtures, and fittings comply with the specifications mentioned in the Agreement of Sale or relevant industry standards.
  • Ensure that the workmanship meets satisfactory standards and is within permissible limits of deviation as per relevant building codes.

5. Structural Engineer's Details:

  • Include details of the structural engineer responsible for overseeing the structural design of the buildings within the project.
  • Specify that the structural design and concrete mix design have been executed in accordance with relevant standards and codes.

6. Preservation of Records:

  • Confirm that all test results related to the project have been properly documented and preserved in the prescribed formats.
  • Ensure that records are maintained for the required duration as per legal provisions.

7. Deviations and Observations:

  • If there are any deviations from the specified quality standards or specifications mentioned in the Agreement of Sale, provide details accordingly.

8. Engineer's Signature and Acceptance:

  • The engineer, acting as the site supervisor, must sign the certificate along with their name, qualification, and license number (if applicable).
  • Obtain the promoter's signature and acceptance of the certificate, along with the date.

By following these steps meticulously, you can accurately complete and submit the Engineer's Certificate (Form 2A) for your MahaRERA project. Always stay updated with any changes in regulations or submission requirements to ensure compliance with MahaRERA guidelines.

0 Comments

Leave a comment